Russia’s Next-Gen Strategic Bomber to Make Maiden Flight in 2023-2024

 

The aircraft is expected to be equipped with an operational engine by the time it takes off for the first time in 2023-2024, he added.

Earlier this week, reports emerged that Russia’s United Instrument Manufacturing Corporation (UIMC) was developing a one-of-a-kind communications system for the PAK DA. The system will be capable of analyzing its state, making adjustments based on these findings and switching its operation modes.

Continue reading